A septic tank was installed beforehand to treat waste water. Showers and toilets have been built and will be reserved for “enkaji”. 3 toilets, a urinal, 4 showers and outdoor sinks are planned.
Inside
A water-resistant cement was used so that cleaning can be done by high pressure hose, nonslip impressions were made on the ground, and specific ceilings for wet rooms have installed.